MINE CONTROL
Pit, Fleet, Dispatch · Real-time fleet management, dispatch optimization
IOC — MINE CONTROL CENTER
INTEGRATED OPERATIONS CENTER
LIVE
--:--:--
ALL SITES ▾
⬡ PIT OVERVIEW
TRUCK LEGEND
🚛Digging
🚛Loading
🚛Hauling
🚚Dumping
🚛Standby
💥Blast Zone
◈ FLEET SUMMARY
Total Fleet
186
Units
Operating
162
87%
Standby
18
10%
Maintenance
6
3%
PRODUCTION — TODAY
Total Material Moved
245,680 t
vs Plan 238,000 t +3.2%
185,420 t
Waste
60,260 t
Ore
DISPATCH STATUS
98
Trucks
12
Loaders
6
Drills
FLEET UTILIZATION
Loading
92%
Hauling
89%
Dumping
85%
Return
82%
CYCLE TIME (min)
Load −0.12
Haul −0.35
Dump −0.05
Return +0.15
◈ MATERIAL BY DESTINATION
DestinationWasteTotalvs Plan
Waste Dump 185,24085,240+4.1%
Waste Dump 272,18072,180+2.3%
Ore Stockpile42,380+1.0%
Crusher Feed17,880+0.6%
Total157,420245,680+3.2%
⚠ ACTIVE ALERTS 12
◈ FLEET BY TYPE
TypeTotalOpUtilAvail
🚛 Haul Truck12010588%92%
🏗️ Excavator282491%93%
⚙️ Loader161486%90%
🚜 Dozer12975%88%
🔩 Drill10880%91%
⬡ DECISION SUPPORT
⛏️
Pit Sequencing
Optimize dig seq
🛣️
Haul Road Condition
Good
🚛
Fleet Allocation
Optimal
🌙
Next Shift Focus
Waste → Dump 3
⬡ HAUL ROAD CONDITIONS
Good
Fair
Poor
76% RCI
⬡ WEATHER
24°C
Light Rain
Wind 12 km/h
Hum 86%
Today
🌧️
24°C
Tomorrow
26°C
Wed
☀️
27°C
Thu
☀️
25°C
◈ KEY PERFORMANCE INDICATORS (MTD)
Total Moved
6,245,680 t
vs 6,020K +3.7%
Fleet Util
86%
vs 84% +2.0%
Cycle Time
36.4 min
vs 37.8 −1.4
Fuel Eff
0.64 L/BCM
vs 0.68 −5.9%
Safety TRIFR
0.45
vs 0.60 −25%
◈ PRODUCTION vs PLAN — 7 DAYS
Total Moved
245,680
vs 238K +3.2%
Waste (t)
185,420
vs 178K +4.2%
Ore (t)
60,260
vs 60K +0.4%
⬡ EQUIPMENT HEALTH (TODAY)
Good142
Warning28
Critical6
Unknown10